Index 04// Work Catalogue
Shipped.
Not Pitched.
Not Mocked.
No.
Client Type
Engagement
Shipped
Guild Size
Discipline
§01// Catalogue Entries 001 – 004
Ten engagements. Nine are still live. Every one has a public write-up.
-
Lending rebuild for a Series B credit company
- Shipped
- 2023·11
- Guild size
- 4
- Discipline
- Product · Eng · Design
-
Inference console for a foundation-model startup
- Shipped
- 2024·03
- Guild size
- 3
- Discipline
- Eng · Design
-
Independent quarterly on technology and craft
- Shipped
- 2024·05
- Guild size
- 5
- Discipline
- Editorial · Design · Eng
-
Multiplayer client for an indie strategy studio
- Shipped
- 2023·08
- Guild size
- 6
- Discipline
- Eng · Design
// Editorial plate · II
"A pitch deck is a confession that the work hasn't started. We start work. We ship. Then we write it down."
— from the Guild's internal notebook, March 2019
§02// Catalogue Entries 005 – 010
Recent additions, smaller scopes, rotating bench.
- 005 Cultural Permanent-collection site for a non-profit arts institution 2024·06 G3
- 006 Web3 Treasury interface for a protocol-governance team 2024·02 G2
- 007 Fintech Onboarding flow rebuild for a B2B payments startup 2024·07 G4
- 008 AI Infra Evaluation harness for a retrieval-augmented generation team 2024·09 G3
- 009 Editorial Reader-first redesign for an independent long-form publisher 2024·10 G4
- 010 Cultural Ticketing platform refresh for an independent cinema chain 2024·11 G5
G{n} denotes bench size (Guildmates assigned). A typical engagement ships within 12 weeks of kickoff — audited across 180+ projects since 2019.
// End of catalogue
If any of this
looked like the
shape of your
problem —
write to us.
A 30-minute call with the Guildmaster. No deck. No proposal doc. A scoping conversation about what you'd ship in the first six weeks if we started Monday.